Cool Breeze Century
|
Description |
Century Ride in Ventura with several course options:
The Mini-Metric goes up the Ventura River Bike Trail to Oak View, return to start and then up the coast to the Fire Station and return.(Same route as 2013)
The Metric@ 58 miles, has been rerouted to Ojai, and then up the coast to the Fire Station and return.
The Century routes follow the coast to Carpinteria, then turn inland through the scenic orchards and flower ranches of East Santa Barbara County.
HILLY CENTURY OPTION – WE ARE NOW OFFERING A HILLY CENTURY TO INCLUDE CASITAS PASS TO THOSE WHO WANT MORE CLIMBING AND/OR WANT TO AVOID THE NORTHBOUND FREEWAY.
Double-Metric Century riders will start on the Ventura River Bike Trail, into East Ojai and over Casitas Pass and connecting with the Century Route into Goleta. (Same route as 2013)
|
Type |
Race - Bike
|
Date(s) |
August 15, 2015 - Aug 15, 2015 |
Frequency |
1-time event (non-weekly) |
Start Time |
6:00 AM |
Level |
Beginner, Intermediate, Advanced |
Where |
Ventura |
Website |
http://www.cibike.org/cool-breeze.html
|
Comments |
Start location is off Highway 33 in Ventura at the Ventura Unified School District Education Service Center at 255 W. Stanley Avenue. |
Members Only? |
Everyone
|
Contact Information
|
Who |
Event Director |
Email |
venturakiwanis@hotmail.com |
Phone |
|
Go Back
|